Thursday, October 8, 2009

East Gable Wall-The last





We've been seeing great flocks of geese flying south. (Click on the first photo and you'll see the line of them across the sky).

Since the last post, we raised the kneewall along the west edge of the second floor (seen in the last photo above). Today we put up the last of the three gable walls (over the kitchen on the second floor), which is the last exterior wall of any serious magnatude; we have partial kneewalls to fill in once the roof framing take shape, but that'll be quick fill-in stuff. So, this means we are effectively onto building the roof, and to that end we put up a pair of rafters at the end of the day on the lower roof over the kitchen. It feels like we're turning a corner where we'll soon be done with all the framing and moving onto the next phase, which will be the trim, siding, windows and doors--but we're not there yet. The roof is it's own project and will offer some interesting challenges to make the roof framing come together correctly. Stay tuned.

No comments: