Saturday, February 12, 2011
We had a spider
My efforts have continued in the kitchen the last few days, mostly hooking up the plumbing, making a back splash for the counter and enclosing/installing the dishwasher. Once the dishwasher was in and a last little bit of cabinet filler was installed on it's right side, we were able to move the refrigerator in from the yurt and finally have all our major appliances and fixtures in and operating. It is not much short of a miracle once again to be able to get water, heat it, make coffee and have refrigerated cream all right in one place and easy to access. I know it's normal and all that, but we've lived for a long time with water out of buckets and all that and now it's just so easy; it almost feels like some sort of embarrassing luxury.
One more coat of finish on the cabinet doors and drawer fronts and we'll call the kitchen "done", at least for a short while. I'll be building an island as soon as we are finished with our obligations to the bank, which should be soon.
Adam finished up a few days ago and now I'll be on my own finishing up the last few projects before we call it good.
Labels:
Adam,
cabinets,
countertops,
kitchen,
refrigerator,
sink,
stove
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment