Two horizontal strips cut out of the sheetrock in second floor bathroom. I'll be installing strapping pieces in there as an attachment point for the vertical bead boardI'm making headway on the kitchen cabinet project although so far most of that progress is on paper, but today I finished off with a materials list for the first phase of the project, which will consist of the guts of the cabinets; the base and plywood walls that will be eventually hidden by the face frame and doors. Like the house its self, you start with the foundation, then move on to framing, and finally finish with the fancier parts. Its going to be fun to actually start building them.
Otherwise, I ordered the necessary plumbing parts for the clawfoot tub, some lamp parts so I can start experimenting building light fixtures and I completed a tile plan for the first floor bathroom. Oh yeah, over the weekend I also cut into the sheetrock in the second floor bathroom to allow for horizontal strapping onto which we'll afix bead board. It would have been easier to have just laid the sheetrock out like it is now rather then having to go back and cut it, but that's how it goes.



1 comment:
It’ really awesome...Thanks for Sharing!!!
Post a Comment