Today we got a start on the second floor, beginning with some adjustments to the first floor walls to make sure everything is plumb and square. We then installed the first structural beam and by the end of the day had the secondary beam in place. More to follow tomorrow with the floor joists to follow.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment