Sunday, February 3, 2013

Wood Update


 Our stack in November 

Where we were a week or so ago

We did a little wood calculating recently.

Back in November we loaded up 42% of a cord onto the porch, calculated in cubic inches. I remember thinking at the time that we should have loaded up an even 50% so that we'd know where we were once we'd burned through it. In any event, I took a picture back then and just now went back and recalculated based on what we stacked. The calculation from the photo matched my memory of what we figured back then: to get up to a full 50% would mean moving 13 cubic feet of wood (which is easy for us because all our wood it cut to 12") from our long term storage over to the porch. We did this today and here is the remaining portion of a half-cord stacked on the porch.

February 3rd

We won't know for a another good month or so where we'll end up, but it is looking like we'll burn somewhere between one-half and three-quarters of a cord, which would make sense. Last year we burned just about a half cord for the season, but it was a reasonably mild winter.

Sunday, November 25, 2012

The stone walkway

Loading the cart

Unloading. Why the cycling jacket? Its hunting season.

Waiting to be placed in the ground

During construction of the house, we put aside a really nice big flat stone. Sometime this summer I got around to setting it in the walk as the first in a series that will become a stone walkway to the driveway. The stone is lovely and it is a really nice first "step" on this little project.

Nancy and I frequently take a walk through the most beautiful wooded area that happens to just be out our back door. It has dramatic rises and falls, an impressive brook running through it and portions of gentle wooded paths. Part of this walk is on my parents land and over time we've noticed a few choice stones that would make welcome additions to our evolving stone pathway. The challenge is that these heavy stones are out in the middle of the woods and how would we get them back up here to the house?

Luckily we have the most amazing hand cart built to plans created by David Tresemer. We are fortunate that the rocks were located uphill from an access way that we were able to back a truck into. I easily walked the cart down through the woods to the stones and then Nancy and I were able to muscle them into the cart and roll them down to the truck. More effort got them into the truck bed and they are now laying on the ground waiting to be laid in the pathway.

Saturday, November 24, 2012

Stair Railing, Pt. 2

I started off wanting to install a railing down the stairs from the second floor to the first, but was delayed slightly by needing to rebuild a section of upstairs railing before I could start to piece together the actual stair rail. With that now complete, I spent some time crafting the railing.

First off I needed to pencil  the height of the completed rail on the wall and then mount the handrail brakets that the railing will sit on when installed. We purchased some nice vintage reproduction brackets from Lee Valley.

One of the rail brackets. I find them really beautiful, but as is the lot of a rail bracket, it is mostly hidden from view behind the railing itself

With the brackets installed I then built up the rail pieces themselves. I had planned to continue the railing detail around the opening on the second floor down, but Nancy said it was way too big.  I then  sized the whole assembly down and it is much better now--easier to grasp and a gentler profile all around.

The junction of the two runs of rail where they meet at the landing


This is where the (newly extended) section of stair opening railing meets the rail that goes downstairs. I'm still not sure how these two are going to connect

The intersections where the railing sections meet are the challenging part since they are coming in at an angle and then making a turn or (in the case where the upstairs railing meets the stair rail) turning, dropping, and then turning again.  I knew the only way I'd be able to work this out was to build everything long and then make fitting decisions where I could actually see the relationships.

That is the next step: work out the connections between the two runs of rail and then sort out how I want to finish it where it enters out into the living room on the first floor. Should it be simple and unadorned and just end at the opening? End in a decorative curl atop a post? Hmm... I enjoy visualizing this kind of thing.

Wednesday, November 21, 2012

Stair Railing


Nice morning light coming in on the section of upstairs railing I'm rebuilding

Its become apparent to me that we need a railing for the stairway between the first and second floors. Any time kids or older folks are visiting I notice the subtle search for support as someone goes up or down the stairs. We are plannng to have a full house here at the end of the year with both young and old alike, so I'm working to get a railing in place beforehand.

This is a somewhat complex project for a couple of reasons. Railings often look simple because they seem to seamlessly wind down the stairway passage, but in fact there are sometimes odd drops and levels that require some creative woodworking and joinery.

The newly rebuilt section of railing that now extends about 6 or 7 inches further along the stair opening. The circle indicates where the post used to be


Additionally, joining the rail to the existing banister that runs along the stair opening on the second floor has required rebuilding a section of the upstairs banister. I resisted making this effort at first since it meant doing some careful deconstruction, but once I committed myself to going that direction it became clear that the project will be much more satisfactory in the end.

As you can see in the photo above, the original banister did not quite reach to the end of the stair opening, as indicated by the light colored circle where the post used to be. I considered various ways that I might extend the existing structure, but in the end decided that the best way to "stretch it" was to rebuild the whole section.  A really nice bonus to result from making this decision was the opportunity to do a better job positioning the vertical wooden posts that sit in groups of three along the span of the railing. When I built the section the first time I didn't really work out a satisfying positioning between the two metal posts and now I have the opportunity to correct that. You may not be able to see it too well in the photo below, but each grouping of three wooden posts now sit nicely centered in the run. It used to be off kilter and it bugged me.

New section of upstairs railing in place with newly positioned vertical posts


With the section of railing rebuilt and extended, now I can get on with my original goal to instal the railing down to the first floor.

Wednesday, June 20, 2012

Solstice paint


I've continued work towards completing our second coat of paint and am nearing the end. Once I reach the end of the wall under the lower roof on the right I will be done.

Tomorrow is the solstice and I thought it would be fun to (nearly) capture that moment when the sun is at it's highest, casting it's near complete shadow over the sun pattern on our south wall.

Monday, March 12, 2012

Spring


This warm weather is presenting an opportunity to finish the painting work that I didn't quite get to finish last fall. It is basically the portion of the wall under the lower roof over the kitchen.

Friday, March 9, 2012

The Desk

The new desk

The storage cabinet closed. Inside is the printer, modem and power strip

The inside of the storage cabinet

Note the arrangement for holding the various cables in place under the desktop. They are easily disengaged if need be.

Detail from one of the cabinet side panels

The office desk is nearly done. We are waiting on a little more hardware and there are a couple of tweaks here and there, but the big stuff is done and in place. I used cherry wood throughout.

You might recall from a previous post that Nancy and I came up with the design by creating a mock-up to test out the arrangement. From there I translated that into a plan for two cabinet bases, a large desk top and a "wing" that slots into the desk and provides good work space and views for Nance, who spends lots of time working at this desk. She's managed with some pretty rudimentary set-ups in the past, so its nice to create something that sets her up well.

The right hand cabinet is a conventional set of drawers; the top one is a simple drawer and the bottom one is a file cabinet sized arrangement.

The left hand cabinet looks like a matching cabinet with drawers but in fact serves as storage for the printer, the power strip, and the modem. The side of the cabinet opens to reveal the stuff inside but doesn't look like a door.

The wing is designed to easily come off so that we can have space to set up a bed in the office when we want to make it into a guest room.

When I was working out the plan, Nancy challenged me to come up with something clever for sides of the cabinets and I was sort of stumped. After tossing around some ideas I decided to stamp the side panels with letters and numbers--the idea being that desks, cabinets, printers and the like are pretty much about generating and holding letters and numbers. The result is subtle, but I'm pleased with how it came out.

A bonus is the keyboard drawer which I picked up the at the state of Vermont salvage store in Waterbury. It is versatile, easy to use, and very solid; a new version of this mechanism would cost over $100. It was a good catch at $10.

When the drawer slides arrive I will build a slide out base for the printer so it'll be easy to load up paper. The drawer pulls will be in that same order and installing those will round off this part of the project. Yet to come are an upper shelving unit along the back of the desk for storage and such. That'll be easy compared to the desk and cabinets.