Two horizontal strips cut out of the sheetrock in second floor bathroom. I'll be installing strapping pieces in there as an attachment point for the vertical bead board
Joe is steadily building out all the window sill, returns, and trim. Each window is a project in its self, but he's got it worked out to a system and is churning through the project really nicely. In essence each window unit gets a box-like unit consisting of the window sill, the side returns (think of them as the walls that go from the sheetrock surface to the window) and the top return (the roof) that when assembled, slides into the rough opening and gets shimmed and screwed into place. Once the box is in, the trim goes on around the perimeter and the window is complete. It sounds straightforward, but there's a lot of planing, sanding, edging, trimming, fitting and beveling that happens to make come out just right.I'm making headway on the kitchen cabinet project although so far most of that progress is on paper, but today I finished off with a materials list for the first phase of the project, which will consist of the guts of the cabinets; the base and plywood walls that will be eventually hidden by the face frame and doors. Like the house its self, you start with the foundation, then move on to framing, and finally finish with the fancier parts. Its going to be fun to actually start building them.
Otherwise, I ordered the necessary plumbing parts for the clawfoot tub, some lamp parts so I can start experimenting building light fixtures and I completed a tile plan for the first floor bathroom. Oh yeah, over the weekend I also cut into the sheetrock in the second floor bathroom to allow for horizontal strapping onto which we'll afix bead board. It would have been easier to have just laid the sheetrock out like it is now rather then having to go back and cut it, but that's how it goes.
1 comment:
It’ really awesome...Thanks for Sharing!!!
Post a Comment