Sunday, October 3, 2010

Weekend Project

Nance painting the second floor bathroom blue

The clawfoot tub. Working on removing the rust on the interior and will soon scrape and repaint the exterior

Various tub and sink parts I need to sort through

Nancy and I each spent time this weekend working in the second floor bathroom; she on painting and I on fabricating the window returns and sill. We are trying to complete the bathroom as a stand alone project in our spare time, outside of our broader work plan, so we'll be able to use it sooner rather then later and it'll be out of the way of other work.

We plan to have bead-board wainscotting up the wall to just below the eaves so Nancy is only painting down to where the beadboard will come up and meet the painted sheetrock.

I also spent some time on the clawfoot bathtub, since we'll be needing this soon enough in the bathroom. I acquired this tub about 9 or 10 years ago from an old colleague in Boston. At the time I was just excited because it held the potential for some far off "someday" dream of having a house in which to use this tub. Now is that time. There are some rust-stained areas that I've been avoiding dealing with because I've been afraid that whatever it is that can take off the rust is also going to remove the enameled surface of the tub, but today I bit the bullet and went for it. I was able to remove a bunch of the rust but after a while decided to let it rest for a bit and go back for another round sometime soon. An inspection later on seemed to indicate that the enamel seems to be okay. Phew.

Another project coming up is working out the various tub faucets and drains. I have a bucket of parts that came with the tub, but I'm not sure that what we need is there. I need to sort through this and figure out what we are going to do.