Saturday, December 5, 2009

Before the snow...

The back (north) side of the house. The bulkhead is lower right

Our new door

Retaining walls with partial gravel fill--more to come


We spent a couple of days last week building the retaining walls on either side of the basement hatchway. Its been on the to-do list for a long time, but it hasn't been pressing, so it was only now that we got to it. With the retaining walls in place, we can level and fill the ground adjacent on either side, which provides level ground for staging to install the windows on the back side of the house.

We also installed the entry door off the porch. As soon as it was in, I took it out of the frame and down to the basement for painting and finishing. Its a beautiful douglas fir door and we're quite pleased with it. Nance suggested that we paint the exterior a shade of green we'd considered for the exterior of the house and so that's what we are going with. Its a cool color. Stay posted for the unveiling.