Monday, November 9, 2009

Roof roof roof

We spent the better part of last week doing all the trim/rough sawn edge work around the perimeter of the whole roof. This includes the drip edge, the roof trim, the ice and water shield and the visible rough sawn overhang sheathing. This is labor intensive and, once done, sets us up to install the plywood over the main part of the house and run right up the roof in short order.
This morning we polished off the very last of the pre-plywood work and then installed a few rafter ties. The rafter ties serve two purposes: mated to the rafters they complete the triangle that becomes the structural unit of the roof, tying the rafters together so they resist spreading from the downward force of gravity; their other purpose is to create a lowered ceiling effect on the second floor while still providing an open view up to the cathedral ceiling. There will be rafter ties on each set of rafters all the way down, so they will act in effect like a loft floor above the second floor. The ties need to be placed within the lower third of the length of the rafter which puts them about 7 feet above the floor.

I am particularly excited about the creative possibilities created by this element of the house design. We can hang things from them, create a loft on top of them, put lights in, on, or around them--whatever we like. They are going to give the second floor a playful and spacious quality that feels great to me. We only installed a few of them today. Once we've got the plywood up on the roof we'll put the rest up.


The weather today was an astounding 65 degrees. It was the first day in weeks that we actually felt hot. I kept joking with Joe that it was too much for me to take and that I thought we'd have to quit early. Given the fact that we are working up high and you have a lot to manage at the same time, its a blessing to not be fighting the cold at the same time.

No comments: