Sunday, July 11, 2010
Goodbye framing
We are beginning the insulating process.
On Friday I put up the first large areas of Insulweb, which is a retaining fabric that will be attached everywhere that we'll be insulating--along the exterior walls and second floor ceilings.
The key is to get the fabric quite taught, so I stapled it up neatly at each corner and then carefully worked it along the whole perimeter. Once the fabric is hung, I come back with a roller and an adhesive glue that I then roll along all the framing members under the fabric. This fixes the fabric wherever it comes in contact with the wood. As soon as we've got the fabric up throughout the whole house, we'll start blowing the cellulose insulation into all the wall and roof areas through small slits in the fabric.
Its such a relief to finally be moving onto this work after a long haul leading up to this point. I expect this work to go relatively quickly and then we'll be on to sheetrocking.
No comments:
Post a Comment
Feel free to leave a comment!