Wednesday, July 7, 2010

A few last pieces in place

Baffling at the top of the first floor wall

Nancy working in the basement to avoid the heat in the yurt

Bill doing the blower door test

The insulation unloaded outside the house


Working in temps up around 100 the last couple of days we are finally ready to begin the insulation. The insulation is all here and loaded into the house; we did the blower door test and were able to get a benchmark for air infiltration into the house; the last couple of in-wall details are complete and we really are ready to start putting up the retaining fabric tomorrow. I'm really excited to finally be getting off the ground with this phase of the work.

No comments:

Post a Comment

Feel free to leave a comment!