The toilet paper holder in the upstairs bathroom. The top part is a shelf and the bottom holds about 6 rolls of tp down in the wall cavity
When we installed the sink the spacing of the lights overhead was off (originally based on the assumption of a longer sink) so I had to re-locate the wiring and then patch up the wall
The appraiser for the bank is coming on Thursday and I am tying up the various loose ends that would make the house appear unfinished, such as the t.p. cubbies in the bathroom, the shelf over the closet on the first floor--things that aren't that big to do, but are nonetheless incomplete. The last thing is lights and I put in a big order for lighting parts last week. I'm hoping they'll get here in time that I'll have the lights looking done, even if they're not quite. There are also multiple touch-up spots where we've cut into the sheetrock or done something that now requires a touch up.
Provided I get the stuff I need, I'll be whipping together a bunch of lights before Thursday AM.
No comments:
Post a Comment
Feel free to leave a comment!