Saturday, January 29, 2011

This weeks' work

One lamp refinished, one waiting for some work

Nancy getting ready to apply the oil finish to the cabinet doors and drawer fronts

The step that Adam built down to the guest room on the second floor

Adam putting in the plugs on the stair tread screw holes


We rounded off this week with more along the same lines as recent work. Adam got the majority of the stairs in and all the screw holes plugged (there are two stairs left to go that require some special shaping before installing, so that'll happen next week). Nancy began work on finishing the cabinets, which is a multi-stage process over many days (we are copying our friend Kate's recipe for cabinet finish which starts with an oil finish and the multiple coats of polyurethane). I did a small rewiring project to make a the switches in the guest room make a little more ergonomic sence, and Felton was here to wire up our stove/oven in the kitchen.

I spent this evening cleaning the oxidization and accumulated stuff off of one of a pair of lights that we plan to mount outside the west end garden doorway. I just happened to come across these lights a couple of months ago in a free pile outside someone's place on the chance we might want to use them. They strike me as a little formal, but they are nice lights so we are going to put them up and see what we think.

1 comment:

  1. I like their shape. What if you painted them a really fun color? Orange? Red? Bright green?

    ReplyDelete

Feel free to leave a comment!