From the archives: This picture shows the delivery truck that brought a big lumber order, including our floor wood back in September 2009.
Today our friends Sally, Jeremy, Anda and Silas came up to help move the pine floor boards from the basement to the first and second floors. We've been storing them for over a year now since we received them along with the massive lumber delivery for the roof framing in the fall of last year.
To move the lumber to the upper floors we each had our jobs: Nancy and Sally and Silas pulled the 16' long boards up through a window on the second floor as Jeremy and I carted them up from the basement and positioned them at the window. Meanwhile Anda stickered each board as they came in. At some point I broke off and started churning out more 3/4" square stickers to keep up with demand while Jeremy continued moving the boards. It was a big effort but felt effortless with the help of such great folks. I had pleasure imagining Anda telling friends at school tomorrow that she stickered wood and her friends saying "What's that mean?" and her being able to tell them.
Beyond this, Nance and I have been quite busy painting, prepping and such. I've been working steadily on lowering the floor of the first floor bathroom shower floor by three inches. Its turned into quite a project. But more about that later.
Tomorrow I go pick up our bathroom tile order.
No comments:
Post a Comment
Feel free to leave a comment!