Today we installed the 23' long steel beam under the first floor floor joists and it went smoothly. This included cutting a small rectangle in the floor to allow the post of our hand-cranked lift to be fully extended to then lift the beam all the way up snug against the joists.
Once we'd lifted the beam up under the floor we installed three adjustable posts. When it was all done the first floor felt quite solid and we eliminated a slight depression in that area. It was an involved project but well worth the effort.