The first floor interior walls show (from l. to r.) the bathroom, the closet, and the mudroom. There is a door from the mudroom that will allow access into the closet. The stairs to the second floor will eventually be located to the left of the bathroom.
This photo shows the closet. There will be a built-in shelving unit that will fill the space opening towards the camera. We currently have a shelf of similar dimensions in the yurt and it works well for us.
This is the upstairs bathroom. The end wall with the door was not yet completed when I took the photo.
Last week was a short work week because we went to Boston on Thursday. Mostly I worked on building the interior walls on the first and second floors. It went pretty smoothly.I was apprehensive that building in the walls would somehow diminish the experience of the first floor; that it would suddenly feel small and cramped and chopped up, but to my relief it actually still feels spacious and open.
Having these walls in place allows me to start laying out the electrical boxes; the switches, the outlets and the mounted lights, which is what I started working on today.
No comments:
Post a Comment
Feel free to leave a comment!