Friday, November 13, 2009
The roof is done!
After a long effort we finally finished the roof on Wednesday!
This means that the house is dried in, which is a major milestone in the house building process. Before we can completely be done on the roof we have to cut holes for the various vents that come through with what are called boots, which are the sleeves that the vent pipes pass up through. To celebrate, Nancy, Joe, and I went out for dinner at the Den and raised our glasses "to the roof!"
Sally and Silas dropped by to say hi and it turns out that although the roof is cool, Silas is really what everybody wanted to check out. Even Motion.
Yesterday we worked most of the day on the rafter ties. This started off with a little consultation amongst the future homeowners about the height they should be placed at. I designed them to be installed at 7 feet off the floor. Joe and I put a few in at this height and we all had this feeling that it was just a little low, so yesterday morning Nancy and I discussed it and decided that it was worth pulling out the ones we'd already installed and moving them up about three inches. Joe and I spent the rest of the day putting them in and at the end of the day it was clear that moving them up that 3 inches made all the difference. It was worth it to back up a little and re-adjust.
Hurray! A roof over your heads!
ReplyDeleteBelated Woots! to you!
ReplyDeleteThanks Mary and Eva!
ReplyDelete