Yesterday Joe and I shaped the gable end rafters and then installed them in the gable end wall in preparation for lifting the wall, probably today. There are some fussy details that have to do with the way the roof sheathing will meet, so it took some time and careful planning to make sure we were on the right track.
Before we finish off the wall we'll be installing trim and some of the clapboard siding up at the peak of the wall since this stuff is so much easier to do while the wall is laying down then it is at the top of a ladder some 25-30 feet up in the air.
No comments:
Post a Comment
Feel free to leave a comment!